Leeds Bradford: Airport Road, Rail & Access Issues

  • Thread starter Thread starter Aviador
  • Start date Start date
  • Tagged users Tagged users None
Use this prefix for new threads for Leeds Bradford Airport
I doubt it because LCC have already proposed to close Scotland Lane as a cut through which would be fine if they sorted out the main roads to the airport but they chose to can the link road.
Its still the plan to build a new road from the A658, North of the Avro factory, linking to the proposed new employment hub and the parkway station. Effectively the Northern end of the canned link road.

So it seems the intention is to use the parkway station for commuters coming from the Otley, Pool, Arthington and Yeadon areas, with ( as I understand it) pedestrian access from the lower end of Cookridge.

If Scotland Lane is closed to through traffic, it will not only stop people living along Scotland Lane accessing the parkway station, but also the airport. Seems a bit counter productive! It would force people to access the airport from Horsforth via Bayton Lane (itself inadequate) and create real traffic issues at the junction with Yeadon High Street and A658. It would also do little to relieve pressure on Horsforth Station, the busiest in Leeds outside of Leeds City.

But, this is Leeds. North West Leeds! Where nothing ever gets done.
 
Last edited:
Its still the plan to build a new road from the A658, North of the Avro factory, linking to the proposed new employment hub and the parkway station. Effectively the Northern end of the canned link road.

So it seems the intention is to use the parkway station for commuters coming from the Otley, Pool, Arthington and Yeadon areas, with ( as I understand it) pedestrian access from the lower end of Cookridge.

If Scotland Lane is closed to through traffic, it will not only stop people living along Scotland Lane accessing the parkway station, but also the airport. Seems a bit counter productive! It would force people to access the airport from Horsforth via Bayton Lane (itself inadequate) and create real traffic issues at the junction with Yeadon High Street and A658. It would also do little to relieve pressure on Horsforth Station, the busiest in Leeds outside of Leeds City.

But, this is Leeds. North West Leeds! Where nothing ever gets done.
If mere mortals like us on the forum can forsee these issues why can't highly paid staff at LCC Leeds Clown College!
 
We will still be talking about the proposed parkway station in 10 years time, this is leeds we are talking about here!! Powerhouse of yorkshire, 2nd financial centre of uk and 3rd most populated city but yet no one can move due to no transport infrastructure! Total joke!
 
We will still be talking about the proposed parkway station in 10 years time, this is leeds we are talking about here!! Powerhouse of yorkshire, 2nd financial centre of uk and 3rd most populated city but yet no one can move due to no transport infrastructure! Total joke!
We can move but only on bikes ha ha
 
We can move but only on bikes ha ha
Speaking of bikes, WYCA have just approved a new railway station at Elland costing £49 million (the original estimate was £20.3 million!) with a further £22 million to be spent on new cycling and walking routes. £22 million!! No doubt the new commitment by WYCA to the LBA Parkway will go the same way with ever increasing costs and seemingly limitless amounts to spend on cycle ways. That is if the Brabin “shovels in the ground” ever materialise.
 
The original cost was approximately £20 million for Elland in 2017. Consultation, after consultation, added delays and costs have ballooned. Similar story for LBA parkway, White Rose etc.

Meantime in Greater Manchester, their mayor seems to deliver. Our Tracy loves a chance for a photo shoot, a sound bite, a promise of something in 2040, but only ever delivers a bus lane, or an expenses bill for another unnecessary international conference that she feels the need to attend, rather than actually delivering to the people of West Yorkshire.
 
Plan ahead.

Big changes at Dawsons Corner: Plan ahead major road works next weekend


Leeds City Council has shared updated information on the next key phase of construction will take place Friday 24 Apr – Mon 27 Apr:

Full weekend closure 24 - 27 Apr of the A6120 Ring Road (Between Dawsons Corner & Rodley) and Bradford Road (B6157) Stanningley

Two-way traffic will be maintained on the A647 and Stanningley Bypass along with access to Owlcotes Center & New Pudsey Train Station.

Signed vehicle and pedestrian diversions will be in place.

IMG_4804.jpeg

Stay updated and find out more: https://dawsonscorner.commonplace.i...AxwzXRYrqsVobsPz6k_aem_O9UFQJxA8cM0cMWS58-RAA
 
Last edited:
Anyone travelled through the new dawsons corner junction yet? Im aware there are still ongoing works and more signage needs to be added, but you need a map to get through it 😂 huge road layout for sure!
 
Anyone travelled through the new dawsons corner junction yet? Im aware there are still ongoing works and more signage needs to be added, but you need a map to get through it 😂 huge road layout for sure!
I was wondering the same. I'm dreading using it now although I'm sure it can only make things better once complete.
 

Remove Advertisements

Subscribe to help support your favourite forum and in return we'll remove all our advertisements. Your contribution will help to pay for things like site maintenance, domain name renewals and annual server charges.



Forums4aiports
Subscribe

Heads Up!

For some weird reason, my days off work tend to involve being out of my flat by 5am and not getting back until 10pm. Back to work and the regular "fix" of 7.40am to 7.15pm hours
Heatwave Mk2 next week?
Some explosive weather build-ups currently in the North of England. What is it like where you are?
LBA: B737-300 G-GDFK empty down to Paris at 16:15 to operate the return LS268 back to Leeds 20:00 ETA where it will then operate the delayed LS265 to Malaga 20:40ETD
LBA: Albastar B737-800 EC-MUB positioning in tommorow afternoon from Gatwick 15:45 to operate a charter to Lourdes/Tarbes on Friday afternoon 14:00 AP7721 STC
I don't believe I am quite covering enough roles at work. Its now 4 on a bad day, 5 on a good day and there is scope for a 6th and 7th role. Still on minimum pay but had the biggest payrise in the company,

Trending Hashtags

Advertisement

Back
Top Bottom
  AdBlock Detected
Sure, ad-blocking software does a great job at blocking ads, but it also blocks some useful and important features of our website. For the best possible site experience please take a moment to disable your AdBlocker.