Bristol Airport Invests £3.5m in Air Traffic Control Tower

Bristol Airport Invests £3.5m in Air Traffic Control Tower

Bristol_Air Traffic Control.webp
Bristol Airport has commenced work on a comprehensive six-month refurbishment of the Air Traffic Control Tower and is investing over £3.5m to improve and enhance the 20-year-old facility.
The Tower will undergo extensive renovations, improving the overall aesthetics and functionality of the building whilst meeting the latest building standards and regulations. It will incorporate environmentally friendly elements such as energy-efficient lighting, heating and cooling system reducing the building’s carbon footprint.
The project will include several significant improvements to the Air Traffic Control Tower including:
  • Over £3.5m investment
  • Lift replacement
  • New external facing
  • Enhanced insulation
  • New doors and windows
  • Enhanced rest facilities for colleagues
  • Roof works
The investment will provide a significantly improved Air Traffic Control Tower for the National Air Traffic Services colleagues and Engineers working on site, providing round the clock air traffic services to the Airport. The project forms part of Bristol Airport’s overall multi-million-pound transformational development plan enabling 12 million passengers a year to use the Airport.

Andrew Goodenough, Infrastructure Director, Bristol Airport, said:
“This £3.5m refurbishment project represents a significant milestone in our efforts to modernise our air traffic control infrastructure and continues to ensure the highest levels of safety and efficiency. We have worked closely with the Air Traffic Control team, and business contract partners to bring these state-of-the-art plans to life. It will be a complex project working with the various teams to ensure the day-to-day operation is disrupted as little as possible, whilst the much needed refurbishment take place.”
The development of Bristol Airport to being a 12 million passenger per annum airport will create thousands of new jobs in the years ahead, open-up new direct air links, and support inbound tourism. This project is one of many to enhance the customer experience and facilities at Bristol Airport whilst meeting the challenge of developing in an environmentally friendly way and the commitment in being a net zero airport operation by 2030.
 

Remove Advertisements

Subscribe to help support your favourite forum and in return we'll remove all our advertisements. Your contribution will help to pay for things like site maintenance, domain name renewals and annual server charges.



Forums4aiports
Subscribe

Heads Up!

For some weird reason, my days off work tend to involve being out of my flat by 5am and not getting back until 10pm. Back to work and the regular "fix" of 7.40am to 7.15pm hours
Heatwave Mk2 next week?
Some explosive weather build-ups currently in the North of England. What is it like where you are?
LBA: B737-300 G-GDFK empty down to Paris at 16:15 to operate the return LS268 back to Leeds 20:00 ETA where it will then operate the delayed LS265 to Malaga 20:40ETD
LBA: Albastar B737-800 EC-MUB positioning in tommorow afternoon from Gatwick 15:45 to operate a charter to Lourdes/Tarbes on Friday afternoon 14:00 AP7721 STC
I don't believe I am quite covering enough roles at work. Its now 4 on a bad day, 5 on a good day and there is scope for a 6th and 7th role. Still on minimum pay but had the biggest payrise in the company,

Trending Hashtags

Advertisement

Back
Top Bottom
  AdBlock Detected
Sure, ad-blocking software does a great job at blocking ads, but it also blocks some useful and important features of our website. For the best possible site experience please take a moment to disable your AdBlocker.