I wonder if a small runway extension will ever make it back onto the agenda at BRS?
The master plan considered various options, all involving an extension at the eastern end (so far as I know, the western end has never been considered - the topography would make it a huge enterprise). The options considered were:
1. Do nothing
2. Extend the runway by 140 metres. This is the maximum that can be accommodated within existing airport land without the need for airport control of Felton Common. Even with this the A38 would need to be lowered into a 150 metre-long tunnel.
3. Extend the runway by 389 metres. This is the maximum extension that can be accommodated within existing airport land but a 240 metre by 150 metre area of Felton Common would need to come into airport control and the ILS localiser and potentially approach lighting would need to be moved to the Common.
4. Extend the runway by 239 metres with a 150 metre starter strip. This would add 389 metres to the 27 take off run but only about 150 metres to 09. However, there would be no need to encroach on Felton Common.
5. Extend the runway further. There are implications regarding the imposition of safety standards that could erode some of the potential benefit and approach lighting would probably have to be relocated onto the Common and possibly extended. The Common is designated as a Local Nature Reserve by the local authority under a 1949 Act of Parliament.
The conclusion was that 'the improvement in performance that might be achieved by extending the runway is relatively small in comparison with the costs and the potential environmental impact'. The airport's preferred option (when the Master Plan was published about eight years ago) was to do nothing but the matter would be kept under review.
Elsewhere in that Master Plan the airport long haul services were considered. The airport believed that there was 'limited demand' for long haul services from BRS and that passenger forecasts suggested demand existed only four lh routes by scheduled airlines ,viz, New York (already operating at the time of the Master Plan publication), Washington, Dubai 'and another US destination such as Atlanta'. However, there was further demand for lh services by 'holiday charter airlines'.
I've read or heard nothing to suggest that the airport's policy has changed in the years since the Master Plan's publication.