Infrastructure, Construction & Developments

  • Thread starter Thread starter Aviador
  • Start date Start date
  • Tagged users Tagged users None
Was to be expected, plenty of supporters of the Vulcan gave up long ago with the management or more mismanagement of the charity.
 
Interesting, is the railway line near ?
3180m from the terminal building to be precise.

I think Doncaster airport is a long way off from getting its own railway station. Its the same frustrating situation as Leeds where to prove the viability of a new station you have to have an airport carrying significantly more passengers.
 
3180m from the terminal building to be precise.

I think Doncaster airport is a long way off from getting its own railway station. Its the same frustrating situation as Leeds where to prove the viability of a new station you have to have an airport carrying significantly more passengers.

We have the same over at Liverpool, and the railway line isnt really too far, about 2-3 miles. There is the parkway station which is good, but an improvement from there would be most welcome. A tram link might be easier. Why does everything take so long in the UK, unless you are in London of course, then possibilities seem endless. Just a bit of that would be nice......." levelling up " !!!??
 
3180m from the terminal building to be precise.

I think Doncaster airport is a long way off from getting its own railway station. Its the same frustrating situation as Leeds where to prove the viability of a new station you have to have an airport carrying significantly more passengers.
It was rejected a couple of years ago as "not good value for money". I think the local MP is trying to drum up a bit of free publicity.
Not 100% sure, but I believe any airport has to have a throughput of 5m pax before a railway connection is considered.
 
It was rejected a couple of years ago as "not good value for money". I think the local MP is trying to drum up a bit of free publicity.
Not 100% sure, but I believe any airport has to have a throughput of 5m pax before a railway connection is considered.
Then again anything outside London is not good value for money. That's why nothing happens.
 
It was rejected a couple of years ago as "not good value for money". I think the local MP is trying to drum up a bit of free publicity.
Not 100% sure, but I believe any airport has to have a throughput of 5m pax before a railway connection is considered.
Didn’t this MP suggest a line to connect to the Lincoln line - with the implication that this would open the catchment area up to ‘9 million’..? The original proposal was to reroute the ECML a couple of miles, slightly better prospect of working but hugely expensive. The latest suggestion is to build an entirely new line from the very quiet Doncaster - Lincoln line. I’d like to know which rail operator he thinks would run that service 🤦‍♂️
 
Totally impractical idea, I can't imagine LNER/HullTrains/Grand Central being happy about adding time to their Journeys.
 
I expect all they will do is divert the hourly Monday to Saturday Lincoln Doncaster train into the airport
 

Remove Advertisements

Subscribe to help support your favourite forum and in return we'll remove all our advertisements. Your contribution will help to pay for things like site maintenance, domain name renewals and annual server charges.



Forums4aiports
Subscribe

Heads Up!

For some weird reason, my days off work tend to involve being out of my flat by 5am and not getting back until 10pm. Back to work and the regular "fix" of 7.40am to 7.15pm hours
Heatwave Mk2 next week?
Some explosive weather build-ups currently in the North of England. What is it like where you are?
LBA: B737-300 G-GDFK empty down to Paris at 16:15 to operate the return LS268 back to Leeds 20:00 ETA where it will then operate the delayed LS265 to Malaga 20:40ETD
LBA: Albastar B737-800 EC-MUB positioning in tommorow afternoon from Gatwick 15:45 to operate a charter to Lourdes/Tarbes on Friday afternoon 14:00 AP7721 STC
I don't believe I am quite covering enough roles at work. Its now 4 on a bad day, 5 on a good day and there is scope for a 6th and 7th role. Still on minimum pay but had the biggest payrise in the company,

Trending Hashtags

Advertisement

Back
Top Bottom
  AdBlock Detected
Sure, ad-blocking software does a great job at blocking ads, but it also blocks some useful and important features of our website. For the best possible site experience please take a moment to disable your AdBlocker.