White Heather
Elite Pro-Member
I agree Bigman. Personally I think the NGT project is a waste of money and whilst it will perhaps provide slightly faster transport into Leeds for some, others (notaby those living in Tinshill and areas of Cookridge not covered by NGT) will find their services reduced. No way will the current no 6 service continue as a 10 minute frequency if its competing with the NGT up to Holt Park. The impact on the environment, with hundreds of mature trees simply chopped down, is also unacceptable. The entire Otley Road and Otley Old Road corridor will never be the same again. However, all that said, only Leeds could come up with a proposed NGT scheme which terminates at ASDA and ignores the fact the City's airport is 2 miles up the road. If this thing has to be built, then it should terminate at LBA from the start. Anything else is simply crazy. That would then link the airport with Headingley and North West Leeds