Search results

  1. A

    Future Infrastructure Developments

    New holding lounge I do believe. Implemented for summer 2016 at the earliest.
  2. A

    Future Infrastructure Developments

    I don't think this is quite right. The modular buildings from manston are going towards the end of the walkway. As far as I know, Jet2 will be moving into either the engineering block top floor or the LBIA vehicle workshop when they relocate.
  3. A

    Future Infrastructure Developments

    Don't quote me, I haven't seen them yet!! Some sort of building(s) second hand anyway. Being delivered over a few days.
  4. A

    Future Infrastructure Developments

    As far as I'm aware, LBA have purchased some additional 'buildings' (possibly porta-cabin type) from Manston. These are being delivered in the middle of the month and installed at the end of the walkway. By the sounds of things though, there will be no walkway extension and the holding lounge...
  5. A

    Leeds Bradford - NOTAM's

    lbaspotter these are to accommodate Echo Taxiway lighting work throughout the winter month nights.
  6. A

    Air Traffic, ILS & Navigation Aids

    The glide path needs to pass it's calibration flight tomorrow/Wednesday then have a 24 hour 'burn in'.
  7. A

    Air Traffic, ILS & Navigation Aids

    How ridiculous. It was his first solo flight. Experienced captains all world-over cause expensive mistakes day in day out. Give the poor lad a chance.
Back
Top Bottom
  AdBlock Detected
Sure, ad-blocking software does a great job at blocking ads, but it also blocks some useful and important features of our website. For the best possible site experience please take a moment to disable your AdBlocker.